top of page

STEEL & WOODWORK FACTORIES – 4,000 sq.m

This industrial project saw the reconstruction of two conjoined factories in Al Shuaiba for KEI (Kuwait Engineering Industries) and AWW (Architectural Wood Works) These factory spaces required high ceilings and a specialized steel roofing system to accommodate the long spans. The project involved large structural components as well as equipment modernization which required the installation of oversized steel trusses to accommodate gantry rails.

This industrial project saw the reconstruction of two conjoined factories in Al Shuaiba for KEI (Kuwait Engineering Industries) and AWW (Architectural Wood Works) These factory spaces required high ceilings and a specialized steel roofing system to accommodate the long spans. The project involved large structural components as well as equipment modernization which required the installation of oversized steel trusses to accommodate gantry rails.

Project Gallery

© 2024 AIC Holding. All rights reserved.

bottom of page